COOLING TUNNEL

PRE-COOLING TUNNEL

PRE Cooling Tunnel

  • 2tiers conveyor belt in an isolated tunnel. Cooling by chilled air blown by fans onto the product and chilled plates arranged below and above the belt
  • for transport and tempering of chewing gum loafs
  • placed between pre extruder and main extruder
INTERMEDIATE COOLING TUNNEL

Intermediate Cooling Tunnel

  • 1tier conveyor belt in an isolated tunnel. Cooling by radiation between product and water chilled plates arranged below and above the belt. No air circulation
  • for cooling of rolled and powdered chewing gum before scoring
  • placed between Rolling and Scoring line part 1 and 2
COOLING TUNNEL

Cooling Tunnel

  • 13tiers conveyor belt in an insolated tunnel. Cooling by chilled air blown by fans onto the product
  • for cooling of extruded bubble gum ropes
  • placed between Extruder and Cut and Wrap machine