COOLING TUNNEL

PRE-COOLING TUNNEL

PRE Cooling Tunnel

  • 2-tier conveyor belt in an isolated tunnel. Cooling by chilled air blown by fans onto the product and chilled plates arranged below and above the belt
  • To transport and temper chewing gum loafs
  • Placed between pre-extruder and main extruder
INTERMEDIATE COOLING TUNNEL

Intermediate Cooling Tunnel

  • 1-tier conveyor belt in an isolated tunnel. Cooling by radiation between product and water chilled plates arranged below and above the belt. No air circulation
  • To cool rolled and powdered chewing gum before scoring
  • Placed between Rolling and Scoring line part 1 and 2
COOLING TUNNEL

Cooling Tunnel

  • 13-tier conveyor belt in an isolated tunnel. Cooling by chilled air blown by fans onto the product
  • To cool extruded bubble gum ropes
  • Placed between Extruder and Cut and Wrap machine
  • Also available with 7, 9 or 11 tiers.